Published projects
Open any document to view it securely in OneDrive.
01
ENHANCE THE COMFORT OF THE OFFICE ENVIRONMENT: IMPROVE PRODUCTIVITY AND FOCUS OF STAFF BY MAINTAINING A CONSISTENT COLD TEMPERATURE.
6 files02
AIRCON REPAIR/REPLACEMENT OF MAGNETIC CONTACTOR AND AIRCON CEILING SUSPENDED CHECK-UP.
1 file03
REPAIR OF AIRCONDITIONG UNIT CEILING SUSPENDED AT GYMNASIUM.
2 files04
ENHANCE THE COMFORT OF THE OFFICE ENVIRONMENT: IMPROVE PRODUCTIVITY AND FOCUS OF STAFF BY MAINTAINING A CONSISTENT COLD TEMPERATURE; REDUCE ENERGY COSTS THROUGH INSTALLATION OF ENERGY-EFFICIENT MODELS.
2 files05
ENHANCE THE COMFORT OF THE OFFICE ENVIRONMENT : RELOCATION OF THE EXISTING FLOOR MOUNTED AIRCONDITIONG UNIT WITHIN THE LIBRARY HUB.
2 files06
ENHANCE THE COMFORT OF THE OFFICE ENVIRONMENT : RELOCATION OF THE EXISTING FLOOR MOUNTED AIRCONDITIONG UNIT WITHIN THE LIBRARY HUB.
2 files